project brief

Protectapeel GlassDefend provided curtain walling protection at White City Living Phase 4, helping protect internal glazing and compatible surfaces throughout the façade installation programme.

category
client

Yuanda Europe Ltd

start date

May 31, 2025

end date

Dec 31, 2027

budget

white city living development

Project Summary

Project White City Living – Phase 4
Location London
Sector Construction
Application Curtain walling façade installation
Product Used Protectapeel GlassDefend

Key Figures

  • 3 blocks within Phase 4
  • Blocks 7, 8 and 9
  • Installation reached Level 9 on Block 8
  • Up to 24 months internal protection
  • BS 476 Part 7 Class 1
  • Clean, residue-free remova

Project Overview

Spraylat International supported Yuanda Europe Ltd with curtain walling protection during the façade installation programme at White City Living Phase 4.

As installation progressed across Blocks 7, 8 and 9, Protectapeel GlassDefend provided temporary protection for internal glazing and compatible surrounding surfaces. The peelable coating helped protect newly installed surfaces from damage during ongoing construction while supporting installation efficiency and quality standards on site.

The Challenge

Large-scale curtain walling and façade installations can leave newly installed glazing and surrounding surfaces vulnerable to scratches, marking, debris and general handling damage.

With work progressing across multiple blocks, Yuanda required a practical protection system that could be applied efficiently, remain reliable for an extended period and be removed cleanly once construction works were complete.

Maintaining surface quality without slowing the façade installation programme was essential.

The Solution

Protectapeel GlassDefend was selected to provide curtain walling protection for internal glass and compatible surrounding surfaces during construction.

Once applied, GlassDefend forms a temporary peelable barrier that helps protect surfaces against scratches, marking and site damage.

With internal protection for up to 24 months, GlassDefend was well suited to the phased construction programme. Once protection was no longer required, the coating could be peeled away cleanly without leaving residue, helping reduce remedial cleaning and the risk of surface replacement.

Technical Information

Product Protectapeel GlassDefend
Surface Type Glass, aluminium, PVCu, acrylic, stainless steel, painted aluminium and polished concrete
Protection Duration Up to 24 months internally
Removal Peelable, residue-free removal
Primary Use Temporary glazing and surface protection
Fire Classification BS 476: Part 7 1997 Class 1

Key Benefits

  • Helps protect glazing and adjacent surfaces from scratches and site damage
  • Easy application supports efficiency on active construction projects
  • Long-term internal protection for up to 24 months
  • Peels away cleanly with no residue left behind
  • Supports quality handover by preserving surface appearance

Product Used

GlassDefend

GlassDefend

Protectapeel GlassDefend is a temporary peelable coating design to protect surfaces such as; glass, aluminium, PVCu, acrylic, stainless steel, painted aluminium, and polished concrete internally for up to 24 months.

 

Results

GlassDefend provided effective curtain walling protection for internal glazing and compatible surfaces while façade installation and construction activity continued.

The straightforward application process supported Yuanda’s fast-paced installation programme while helping reduce the risk of scratches, surface marking and associated remedial work.

At the end of the protection period, GlassDefend could be peeled away cleanly without leaving residue, helping preserve the appearance of the installed surfaces ahead of handover.

Conclusion

At White City Living Phase 4, Protectapeel GlassDefend provided Yuanda Europe with a practical curtain walling protection solution for a demanding multi-block façade installation programme.

Combining easy application, long-term protection and clean removal, GlassDefend helped maintain the quality of internal glazing and compatible surfaces from installation through to handover.

recent projects

  • See how Protectapeel GlassDefend protected 30,000m² of glass at One Nine Elms, reducing damage and repair costs for Multiplex.

    One Nine Elms Glass Protection
  • Protectapeel GlassDefend was selected to provide reliable temporary protection for vulnerable internal surfaces throughout construction of the Kennington Park Community Centre redevelopment

    Kennington Park Community Centre